HAVING A SCALE CAN INCREASE YOUR BOTTOM LINE
PLUG IN YOUR DATA AND SEE FOR YOURSELF
| FILL IN YOUR OWN INFORMATION | EXAMPLE | PLUG IN DATA HERE |
A How many days per week are you operational? |
5 | |
B Total days you are operational per year (typically Ax52) |
260 | |
C How many trucks do you load per day? |
50 | |
D Total trucks you load per year (typically CxB) |
13000 | |
E Percentage of mis-loaded trucks per day? |
17 | |
F Total number of mis-loaded trucks per day (CxE/100) |
8.5 | |
G Total number of mis-loaded trucks per year (typically FxB) |
2210 | |
| |
||
ASSUMPTIONS WE MADE |
||
H Minutes Lost to adjust misloaded truck* |
16 | |
I Per Hour Operational Cost for equipment and labor** |
215 | |
J Per minute Operational Cost for equipment and labor (I/60) |
3.58 | |
* Based estimated time to reload, tip-off, wait at scale house and reweigh as necessary. ** Cost based on following per hour usage costs for 1 loader and 1 truck: . Wheel Loader (Loader and Labor): $125/Hour . Truck (truck and labor): $90/Hour |
||
| |
||
Formula to find out your potential yearly operational costs savings: G x H x J |
||
| Potential Yearly Savings on Operational Costs: | $126,588.80 | 0 |
| Please note that the above estimate does not take your potential savings in fuel and additional trucks you will be able to load because of the time you saved into consideration | ||